The total land area of the project is 8.78 acres, and the service scope covers the Pingshan area of Shicheng County Industrial Park, from the irrigation canal in the north to Chuangye Second Road in the east, and from Chuangye Fifth Road in the southwest. The overall design sewage treatment scale of the project is 3000m3/d and will be constructed in two phases. The first phase of civil engineering will be constructed at a rate of 3000m3/d and equipped with wastewater treatment equipment at a rate of 1000m3/d; The second phase is equipped with wastewater treatment equipment at a capacity of 2000m3/d, excluding the sewage collection pipeline network and the dedicated management of tail water discharge. Waste gas: The main sources of environmental air pollution are the decomposition of organic matter in sewage and sludge, as well as the foul odor gases emitted during the fermentation process, as well as the cooking fumes from employee canteens.
Odor components | Odor inlet indicators | Odor discharge indicators | Exhaust pipe height |
H2S | ≤100mg/m3 | ≤0.6kg/h | 15m |
NH3 | ≤40mg/m3 | ≤0.6kg/h | |
C2H6S | ≤50mg/m3 | ≤0.6kg/h | |
Odour | ≤3000 | ≤800 |