1、 Overview of Construction Projects
Construction Project Name: Lianjiang Kemen Green Textile Industrial Park Sewage Treatment Plant Project
Construction location: Within the Kemen Green Textile Industrial Park in Lianjiang, Fujian Province
Construction nature: New construction
Construction content and scale: The project covers an area of 43885 square meters. The main building contents include the reuse water truck room, equipment room, ozone room, distribution room, office building, regulating tank, anaerobic tank, aerobic tank, sedimentation tank, reclaimed water reuse tank, and other structures and buildings. Sewage treatment capacity of 55000 tons/day; The amount of recycled water is 25000 tons per day.
The main environmental issues of engineering construction include the impact on water environment, atmospheric environment, and acoustic environment during the construction and operation periods. After taking appropriate environmental protection measures, the adverse effects of project construction can be reduced.
Odor components | Odor inlet indicators | Odor discharge indicators | Exhaust pipe height |
H2S | ≤100mg/m3 | ≤0.6kg/h | 15m |
NH3 | ≤40mg/m3 | ≤0.6kg/h | |
C2H6S | ≤50mg/m3 | ≤0.6kg/h | |
Odour | ≤3000 | ≤800 |